Also available in Persian — نسخه فارسی EN فا
❓ Unknown

Implementation of the Overpass Intersection Improvement Project at the Karavansara Sanghi on the Qom-Jaferabad Highway

Just now September 22, 2026 1 min read 📰 ISNA
📋 Key Takeaway

An improvement project is being executed at the Karavansara Sanghi intersection on the Qom-Jaferabad highway to enhance safety by modifying ramps and loops. This initiative is led by the local road maintenance authority and aims to reduce accident risks in the area.

The head of the Road Maintenance and Transportation Department of Jaferabad County stated: As part of a project to address accident-prone points, the improvement of the ramp and loops at the Karavansara Sanghi intersection on the Qom-Jaferabad highway is underway, involving a length of 300 meters and the installation of 12 concrete pipes with a diameter of 1.5 meters and a pouring volume of over 250 cubic meters.

🌐

Translated from the original and edited for English readers. View original source →

Translation confidence: 85%

📰 Related Coverage

⚖️ Independent Platform — Artesh.com is not affiliated with any government, military, or political organization. Editorial Policy →