Also available in Persian — نسخه فارسی ✈️ Telegram EN فا
❓ Unknown

Inauguration of Phase One of the Gas Transfer Project from the Caspian Sea to Europe

Jan 26, 2026 January 26, 2026 4 min read 📰 Radio Farda
📋 Key Takeaway

The Southern Corridor gas project, aimed at transferring gas from Azerbaijan to Europe, was inaugurated, with a total investment of $30.7 billion. The project will deliver 16 billion cubic meters of gas annually, with Iran's involvement diminished due to U.S. sanctions. This development is significant for European energy diversification and Azerbaijan's role in the energy market.

🔍 Quick Context Guide
💡 Bottom Line: The Southern Corridor project enhances Azerbaijan's energy role in Europe while diminishing Iran's influence due to sanctions.

👥 Key Players

Azerbaijan MENTIONED
Country and gas supplier
"Azerbaijan is a key player in the Southern Corridor project, enhancing its position in the European energy market."
Iran MENTIONED
Stakeholder in gas production
"Iran's reduced involvement due to U.S. sanctions affects its economic interests and regional energy dynamics."
Turkey MENTIONED
Transit country
"Turkey plays a crucial role as a transit hub for gas flowing from Azerbaijan to Europe, impacting its energy security."
European Union MENTIONED
Energy consumer
"The EU seeks to diversify its energy sources, reducing dependence on Russian gas, making this project significant for its energy strategy."

📰 What Happened

Phase One of the Southern Corridor gas project was inaugurated, allowing for the transfer of gas from Azerbaijan to Europe. The project aims to deliver 16 billion cubic meters of gas annually, with a significant portion going to Turkey.

  • The project has a total investment of $30.7 billion.
  • Iran's involvement has diminished due to U.S. sanctions, impacting its gas export potential.

💡 Why It Matters

🇮🇷 For Iran: Iran's reduced role in the project limits its economic benefits and influence in regional energy politics.
🌍 Regional: The project strengthens Azerbaijan's energy position while sidelining Iran, altering regional power dynamics.
🌐 International: For the EU, this project is vital for energy diversification, reducing reliance on Russian supplies amidst geopolitical tensions.

📚 Background

The Southern Corridor is part of a broader strategy to transport Caspian gas to Europe, aiming to reduce dependency on Russian energy. Iran, despite being a gas-rich country, faces challenges due to international sanctions.

Energy security in Europe U.S. sanctions on Iran
📡 Source: NEUTRAL
📊 Confidence: 70%
The information is sourced from Radio Farda, which provides coverage on regional issues, though it may reflect perspectives critical of Iranian policies.

Phase One of the "Southern Corridor" gas project was inaugurated on Tuesday evening, June 22. This 3,500-kilometer project, valued at $40 billion, is set to deliver 16 billion cubic meters of gas from Azerbaijan in the Caspian Sea to Europe annually by 2020. Six billion cubic meters of this gas will be consumed by Turkey, while the rest will head to Europe. The final capacity of this project will reach 31 billion cubic meters by 2025. Currently, the pipeline from Azerbaijan to Eskisehir, near Istanbul, has been completed, and with its inauguration, gas from Phase Two of Azerbaijan's Shah Deniz field, in which Iran also has a 10% stake, is being sent to Turkey. The Southern Corridor consists of four projects: Phase Two of the Shah Deniz field in the Caspian Sea, the South Caucasus Pipeline from the shores of Baku to western Georgia, the Trans-Anatolian Pipeline (TANAP) in Turkey, and finally, the Trans-Adriatic Pipeline (TAP) that runs from Greece to Italy. The European section of the TAP pipeline is over 70% complete. Afghan Isayev, the head of the Southern Corridor company of Azerbaijan, which is responsible for financing the country's share in the project, stated in an interview with Radio Farda that as of the beginning of last month, a total of $30.7 billion has been invested in this project, and approximately $9.7 billion more needs to be provided by the project shareholders to complete it to Italy. Besides Azerbaijan, ten foreign companies are shareholders in this project. Isayev mentioned that NICO (the Iranian oil trading company affiliated with the Ministry of Oil) holds a 10% stake in the Shah Deniz field (Phases One and Two) and the South Caucasus Pipeline. The cost of Phase Two of Shah Deniz and the expansion of the South Caucasus Pipeline is slightly over $27 billion. Phase One of the Shah Deniz field, which produces 10 billion cubic meters of gas annually, has been operational since 2007. The final production capacity of the two mentioned phases of the Shah Deniz field will reach 26 billion cubic meters annually. Ibrahim Ahmadov, the spokesman for the State Oil Company of Azerbaijan (SOCAR), which is one of the project shareholders, stated in an interview with Radio Farda that the main cost of this 3,500-kilometer project to deliver 16 billion cubic meters of gas to Turkey and Europe has been incurred, and to reach its final capacity of 31 billion cubic meters, minimal additional investment is needed, as simply installing a few compressors will double the gas transfer capacity. Previously, the possibility of transferring Iranian gas to reach the project's final capacity had been mentioned, but with the return of U.S. sanctions on one hand and prioritizing Iran's gas exports to regional countries on the other, Iran has been removed from the list of gas supply sources for this pipeline. Ilham Shaban, director of the Caspian Oil Studies Center and an expert for the British publication "Natural Gas World," stated in an interview with Radio Farda that in recent months, Azerbaijan has signed several major contracts with European companies, and there are currently no concerns about reaching the project's final capacity of 31 billion cubic meters annually solely relying on Azerbaijan's gas. Last month, Azerbaijan signed two contracts for the development of gas fields in the Caspian Sea with Statoil of Norway. In April of this year, the development of the "Absheron" gas field in Azerbaijan began with Total of France, which is expected to be operational next year. Additionally, British Petroleum, which operates the Shah Deniz field, is preparing to develop two new gas fields in Azerbaijan. Azerbaijan also signed a new $40 billion contract last year for further development of the "Azeri-Chirag-Guneshli" oil fields with foreign partners, which alongside crude oil, has a massive volume of gas reserves. Currently, over 12 billion cubic meters of gas are produced annually from this field, part of which is delivered to Azerbaijan, and the rest is reinjected into oil fields to increase reservoir pressure. All these fields are located in the Caspian Sea. Except for Iran, all Caspian coastal countries have been producing oil and gas from their sovereign waters for years.

🌐

Translated from the original and edited for English readers. View original source →

Translation confidence: 85%

📰 Related Coverage

⚖️ Independent Platform — Artesh.com is not affiliated with any government, military, or political organization. Editorial Policy →